MELBOURNE
METRO
This project involved the partnership with Mass Transit Railway (MTR) which drove us to further refinements of the Melbourne Metro. Using our CPT, self-guided steering replaced channels and with landing gears, we could cross passage frames.
A conveyor enabled accurate placement and crafted a safe workplace. Prep work included crack inducer and dowel bar installation. We introduced satellite platforms to enable the placement and finishing to operate independenty.
Project Information
| Location | Melbourne, VIC |
| Date | 2020-2021 |
| Client | Buoygues, John Holland & Lendlease |
| Industry Sector | Rail |
| Project Type | Equipment Supply |
| Construction Type | Tunnel |
| Length | Twin 4.4km |
| Stations | 4 |
| Super Elevation (max) | 0° |
| Configuration of Machines | 110 – B |